The phenol&acetone project invested by GPCC with
the capital of RMB 626 million is a major project coordinating
with the 900,000t/a ethylene cracker project. The construction
began in Jan. 6,2001. According to the schedule, it
has started commissioning by the end of 2004.
main
plants and scales
phenol 124,000t/a
acetone 76,000t/a
isopropylbenzene 162,400t/a
Besides,GPCC also invests in ABS(200,000t/a) and SBR(100,000t/a
butadiene-sodium rubber) Projects. ABS project started
operation in January, 2007 and SBR project started operation
in Aug. 2006.
|